Home > Media & Resource > Blog

Overhead crane factory visit: Crane parts and overhead crane inspection

27 Feb, 2018

Vietnam client visited Dongqi overhead crane factory, inspecting Dongqi overhead crane parts workshop, electric fem hoist workshop, overhead crane production workshop, etc. 32 ton double girder overhead crane for French client has won his thumb up.

As per the schedule of Mr. Alexander Melnik, we picked him up in Jiaozuo city, Henan Province at around 14:00 on November 14th,2017. Then we spend 2 hours’ drive to Dongqi overhead crane factory and it was around 5:00PM.

Dongqi Crane is one of the few manufacturers who owns the overhead crane production line from the crane parts to the completely overhead crane, which can ensure the overhead crane quality from the very start and on the other hand, the delivery time of the overhead crane can be guaranteed.

Crane parts: crane bearing and drum

Crane part: crane hook

Crane winding drum production line

In the new factory, we have the completely winding drum production. Import the steel plate -----Automatic cut them into the suitable dimension-----Bend it into the knurled knob shape----welding---polish the wire rope race--painting.

Overhead crane part

Overhead crane part

Double girder crane production warehouse

In the double girder crane production workshop, 40 sets double girder overhead crane can be produced simultaneous in the factory only.

Double girder overhead crane

32 ton double girder overhead crane inspection

During visiting, the 32tons double girder overhead crane for the French client is ready and the Vietnam client has inspected the overhead crane, which won his thumb up.

32 ton double girder overhead crane

32 ton overhead crane

Here one thing before Mr. Alexander coming, this 32 ton double girder overhead crane has been disassembled after the crane commissioning. Below please check the assemble pictures of the 32 ton double girder crane.

Please check the 32 ton overhead crane main girder connection, which is connected by the high strength bolts and steel plate.

Double girder overhead crane connection

Crane girder connection

Automatic cutting line

Then we take Mr. Alexander to check our automatic welding/cutting machinery. Here we explained that automatic cutting line. From the starting, it is the steel coil, then it will be automatically cut into the steel plate with the suitable dimensions.

Overhead crane shipment

During visiting, Mr. Alexander pointed out that it would be better to have the crane parts pined up by wire rope than welding.

Double girder overhead crane shipment

Crane cabinet control, joystick and others

During inspection, we introduced the difference between the traditional crane cabinet and European cabinet from the view angle. As the European cabinet has a better view angle and this is what we will supply.

crane cabin for overhead crane and gantry crane

Then Mr. Alexander asked the question refer to the joystick. He asked why the joystick quantity is different in the two cabinets. We explained the joystick quantity is based on the lifting hooks. For example we supplied you is the 3 joysticks,2 joysticks to separate control the main/aux lifting; 1 joystick(4 directions) to control the cross traveling and long traveling.

European hoist warehouse

Then we take Mr. Alexander to check our European hoist assemble warehouse.

fem hoist for overhead crane

fem electric hoist for overhead crane

8 wheels overhead crane

At last we ask Mr. Alexander what else he want to inspected. He said the 8 wheels overhead crane. We say yes, then we take them to check our installed 8 wheels overhead crane in our warehouse.

8 wheels overhead crane

Till then, the factory inspection is finished. Then we take them to Zhengzhou city. We talked to them we have one branch office near to them hotel and we invited them to visit the branch to discuss the order future.

Zhengzhou office of Dongqi Crane

In the next morning, we take Mr. Alexander to our Zhengzhou branch office. Here why we set up one office here, because Zhengzhou is in the central of China. This city located at the cross heart of both China high speed train and general speed train position. It is one of four biggest train city and the biggest train transfer center in China. So we called here train heart of China also.
Meanwhile, Zhengzhou airport owns the biggest passenger flow/goods flow in the central of China now. Zhengzhou airport takes the front No.13 position of passenger flow and front No.8 position of goods flow among all the China airports. Meanwhile Zhengzhou city is one very important stop among the Eurasian Continental Bridge railway and the biggest Asia marshalling station for railway shipment. This is one main reason why we set up one branch office here.

If you want to visit our factory, please feel free to contact us. 

Top